<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE pkgmetadata SYSTEM "http://www.gentoo.org/dtd/metadata.dtd">
<pkgmetadata>
	<longdescription>
		Interrupted Time Series with a Control and Multiple Interventions
		// Provides tools to perform interrupted-time series through a
		generalised least squares (GLS) framework on linear outcomes.
		Allows for multiple interventions and a control with ARMA
		(autoregressive and moving-average) correction. For more
		details see Lopez Bernal, Cummins, and Gasparrini (2017)
		doi:10.1093/ije/dyw098.
	</longdescription>
</pkgmetadata>
