Title: stuff overlay: active maintenance resumed, AI-assisted workflow disclosed Author: Ivan S. Titov Posted: 2026-05-06 Revision: 1 News-Item-Format: 2.0 After a prolonged time of dormancy, this overlay is under active maintenance again. This news item summarises about a month of work. == What has changed == * Per-package audits — pkgcheck cleanups, dated rationale for suppressions, metadata.xml normalization. * Version handling — keep last-of-each-major for rollback; drop versions whose upstream caps don't solve against ::gentoo rather than relax the cap. * sys-kernel/pf-sources -r70 GA-based slots — see the separate news item dated 2026-05-06. * Sister distfile repo at github.com/istitov/extra-stuff for bundled patches that would otherwise hit pkgcheck's SizeViolation in the main overlay. == AI / LLM assistance == AI-assisted work begins with commit 075ff35d (2026-04-19); the last fully-human commit is d0e1aa01 (2026-04-18) — a clean before/after boundary for review or bisect. The maintainer uses LLM tooling for mechanical work; every commit is human-reviewed before landing, and the maintainer bears responsibility for correctness. Full policy and PR disclosure expectation: CONTRIBUTING.md, "🤖 AI / LLM assistance". Regressions, or anything that looks LLM-generated and wrong: file at github.com/istitov/stuff/issues with the failing emerge log. == References == * README.md — overlay highlights and design choices. * CONTRIBUTING.md — house-style checklist and AI/LLM policy.